Comment to the Forest Service for Twice the Trail at Feather Creek!

MAMBA Community,
The Forest Service is proposing new “trails that provide loop opportunities for mechanized recreationalists.”
That’s mountain bikers. We’re the mechanized recreationalists.
Their plan is to build up to 20 new miles of singletrack at Feather Creek, more than doubling the only designated and purposed built mountain bike trails on the entire Nez Perce–Clearwater National Forest.
They’re asking for public comments, before Monday, October 26.
We’re hoping you’ll leave one.
What’s in the plan
- Up to 20 new miles of trail, built with input from MAMBA (that’s us!), and tied into the existing trails for more loop options. (Loops on loops on loops.)
- A real trailhead with parking, a vault toilet, and a kiosk.
- A day-use area with picnic tables and fire rings.
- A 2-mile connector trail from new parking lot to the trailhead
Not just about the bikes
The trails will be built to mountain bike standards, and will be open to hikers and horses too. The project also includes stream restoration, thinning, and timber harvest.
Just as important, Feather Creek and the West Fork Potlatch River contain designated critical habitat for Snake River Basin steelhead, making this project about more than just adding trails. The project would remove a chronic source of sediment, reconnect the floodplain, restore meadow and riparian habitat, and improve fish passage. It also includes fencing to keep cattle out of the restored West Fork Potlatch meadow, helping protect fish and riparian habitat as it recovers. More trails AND better steelhead habitat is exactly the kind of project we should get behind!
Why you should comment
As of Friday October 16 morning, there have been 18 comments on the project. 8 of them oppose it, and 6 are either against the development of new trails or anti-mountain biking.
In 2015 in Washington, 500 hikers wrote in about a timber sale, and the Forest Service moved their planned logging away from a popular trail. In Montana in 2011, a round of letters from riders kept Big Sky’s bike trails open.
And, things go the other way too.
In 2023, a planned project in Oregon with 52 miles of new trail got cancelled after enough people complained. That same year, a 40-mile network in Colorado got scrapped the same way.
The Forest Service listens to public comments. You’re the public. No-one comments like you do.
How to comment
You can start by going to the project page to get all the details. Don’t worry, it’s just 177 pages of dense land-use analysis, planning tables and memos from public officials. Shouldn’t take you more than an hour or 12. Or you can jump to the bottom here for a short blurb pertaining to recreation straight from the documents!
When you’re back (we’ll wait), here are some high points to mention in your comment:
- Start with you. (You are, after all, pretty great). How often you ride, hike, or run at Feather Creek, who you go with, and what you love about it.
- Support the trails and trailhead. Let the FS know you support the new trail, the connector, and the new trailhead and day-use area.
- Ask for the full 20 miles. The documents say both “20 miles” and “up to 15 miles plus a 2-mile connector.” Ask that the final decision commit to the full 20.
- Protect the trails we already have. Ask that skid trails, landings, and temporary roads stay off the existing trails (767 and 768) during harvest, and that any damaged sections get repaired afterward.
- Mention the shared benefits. Our mothers taught us to share, and we haven’t forgotten. The trail system will benefit a wide range of users including hikers, runners, equestrian use, local families, and youth mountain bikers.
- Mention the volunteers. Riders cleared about 200 downed trees from these trails this summer. If you’ve volunteered for trail builds with MAMBA, and/or would be willing to work on trails at Feather Creek, bring it up.
- Say Its Name. It’s a catchy one: “Feather Creek Landscape Restoration Project, #302702.”
Go to the Feather Creek comment form
(The comment form has been having issues loading. If it won’t load for you, you can email the district ranger Buddie Carroll at Buddie.carroll@usda.gov, just make sure you include your name, address, e-mail address, phone number, and that you’re emailing him with your comments because the comment form for Project #302702 won’t load).
It takes about ten minutes. In exchange, you’ll help build more trails in our region, and earn our eternal gratitude.
Not a bad deal, right?
Thank you (pre-emptively) for your time and support,
MAMBA Trails Board of Directors
Here is the exact language from the Forest Service about recreation in the “Feather Creek Landscape Restoration Project Proposed Action for Comment” document if you cannot access it online.
“Additions to the non-motorized trail system, expanded parking, and establishing a day use area would provide ecosystem services to the recreating public and contribute to local economies by providing enhanced opportunities for recreation that align with lifestyles of area residents and forest visitors (FW-DC-ES-02).
After relocating FSR 377, recreation access would be managed by constructing a trailhead for the Feather Creek trail to provide adequate parking for all forest users at what is currently a dispersed recreation site (FW-DC-REC-02). The new Feather Creek trailhead would include an information kiosk, concrete vault toilet, two cattle guards, hitching rails for equestrian users (FW-DC-ED-01), and defined parking spaces. The new trailhead would improve drainage to route sediment away from Feather Creek by hardening surfaces and establishing drainage routes. Water quality at this recreation site would improve with the installation of physical barriers to prevent further damage to sensitive riparian areas (FW-DC-ARREC-01).
North of the Feather Creek trailhead, a new recreation day use area would be constructed. This day use area would include American Disability Act compliant access, picnic tables, fire rings, and a fenced perimeter to protect the aquatic resources within the area (FW-DC-REC-06, FW-DC-ARREC-01).
In order to enhance the nonmotorized recreation experience, an additional 20 miles of trail would be constructed. A 2-mile trail connector west of FSR 789 would connect the new trailhead to the existing trail system (Trails 767 and 768). This connector trail would limit potential conflicts between trail users and road traffic. The trail would be constructed to the same specifications as the existing Feather Creek trails (FW-DC-REC-09). Three non-motorized trails totaling up to 15 miles would be constructed to tie into the existing trails (Trails 767 and 768) to create a larger trail network to provide multiple loop options. Trails would be built in partnership with the Moscow Area Mountain Bikers Association, to the same designated use bicycle trail class 3 trail management objectives as the existing trails. Other designated uses would also include hiker/pedestrian and pack and saddle (FW-GL-REC-02, FW-DC-REC-10).”

Thank you for supporting MAMBA and helping us keep the trails we love thriving.
